"As-is" delivery means you accept the space in its current condition, with no obligation on the landlord to fix or update anything — so whatever's wrong on the day you get the keys becomes your responsibility, permanently. It reads like boilerplate. It's one of the most quietly expensive sentences in a commercial lease.

This is the first "clause of the week": one lease term, in plain English, and where it bites.

What does "as-is" actually shift onto you?

Every existing problem in the space. If the HVAC is on its last legs, that's your problem. If the electrical panel can't handle your equipment, your problem. Tired plumbing, a leaky roof, prior-tenant damage — your problem, on day one.

The reason it catches people is that a space can show well and be worn out. You tour on a pleasant October afternoon, the lights are on, it looks fine — nobody runs the heat to see if it survives January or load-tests the electrical. "As-is" feels harmless in the moment and reveals itself the first cold week.

How do I protect myself from an "as-is" clause?

Inspect before you sign, negotiate the delivery condition, and separate "as-is" from your build-out.

  • Inspect first. For anything beyond a tiny space, pay a contractor or engineer to check the major systems. A few hundred dollars can reveal a several-thousand-dollar problem you're about to inherit.
  • Negotiate the default. "As-is" is a starting position, not a law. Common middle grounds: the landlord delivers major systems "in good working order" as of the commitment date, warrants the HVAC for an initial period, or agrees to a punch list before you take occupancy.
  • Mind the systems you're not replacing. Even if you're gutting the interior with a TI allowance, watch the rooftop HVAC unit that isn't part of your build.

There's nothing hidden about "as-is" — it's right there in plain sight. The gap isn't secrecy; it's fluency. Closing that gap is most of what representation is. And get your attorney on the delivery and repair language before you sign.